Friday, October 3, 2025

This is Your Mine Countermeasures

The last Avenger class mine countermeasures (MCM) vessel, USS Devastator (MCM 6), has now been retired.[1]  Our surface MCM capability is now entirely in the hands of the Independence class LCS.  Yes, that LCS.  The ship and MCM module that has suffered years of delay, failure after failure, and no realistic operational testing.  That one.  That disaster.  No, this isn’t a Halloween horror story, although it should scare you to death.  This is our current naval MCM reality.
 
To briefly review, the LCS-MCM consists of a helo and an unmanned boat, each of which carry/tow various attachments as listed below.
 
MH-60S Seahawk mine warfare helicopters 
  • AN/AES-1 Airborne Laser Mine Detection System (ALMDS) shallow water laser mine detection
  • AN/ASQ-235 Airborne Mine Neutralization System (AMNS) suicide drones
 
Common Unmanned Surface Vessel (CUSV) tow boat 
  • AN/AQS-20C forward/side scan mine detection sonar
  • Unmanned Influence Sweep System (UISS) acoustic and influence sweep
 
Now, how is that all working?  Go read the annual GAO and DOT&E weapon assessments and you’ll get the history and status of the LCS MCM module.  It’s not pretty.  In addition, Naval News website offers a fantastic summary of the Independence-MCM.  Here’s some excerpts. 
Embarked helicopters also operate with the AN/ASQ-235 Airborne Mine Neutralization System (AMNS), offering a safer method to counter-mine potential threats compared to traditional mechanical minesweeping with EOD divers.[1]
Safer?  Yes.
Effective?  No.
Efficient?  No.
Fast?  No. 
The sonars on the CUSVs are not a high enough resolution to identify specific threats. The lasers used on MH-60S helicopters require water that is not too turbid to operate in.[1]
So, the system only works in clear water and even then can’t reliably identify the threats?  Good … good. 
… when it comes to the unmanned systems used for mine countermeasures. Each mission takes roughly four hours of maintenance pre-mission followed by one-and-a-half hours of calibration of GPS and sonar to reach acceptable accuracy for MCM missions. The rough estimate is six hours of pre-mission preparation before mine countermeasures can begin. In real-world scenarios, that time may not exist.[1]

So, the equipment may not be effective but it’s slow.  Agonizingly slow.  That might be okay for clearing a fifty foot wide channel over the course of a month but that’s useless for combat operations. 
These concerns do not address the single points of failure in the LCS and MCM package, which make the package an extremely risk-prone platform for operations.
 
The platform lift on the LCS that moves equipment from the mission bay to the flight deck is a major operational point for equipping the MH-60S with ALMDS or AMNS. If the lift fails, the helicopter is combat ineffective. If the tow hook on a CUSV breaks, it is combat ineffective and must be towed back or recovered another way. If the Twin Boom Extensible Frame, used to lower CUSVs into the water, breaks, the entire MCM platform is inoperable and USVs cannot be launched for missions.[1]

As an example, 
One test of the MCM package on USS Tulsa (LCS 16), a ship that arrived in Bahrain in May for MCM operations, resulted in a runaway USV, according to one U.S. Navy official familiar with the testing. During that test, part of the tow bracket used to recover the mine countermeasures CUSV broke, leaving it unrecoverable.[1]

But wait, there’s more! 
The components of the LCS MCM mission module were not originally designed to be loaded into the 30,000 square feet of mission bay space and shortcomings have been encountered in balancing the space between 11 meter CUSVs, four or five 12-foot CONEX boxes, a lift system for the CUSVs, and an independent berthing box for the operators of the MCM suite.[2]
 
Due to these space constraints, modularity of this platform is no longer offered or being pursued by the U.S. Navy to switch between mission modules, a sharp turn from the original planning of the LCS.[2]
 
According to Captain Scott B. Hattaway, Director of the SMWDC Mine Countermeasures Technical Division, the 11 meter CUSV is currently limited by form factor, limiting the endurance of the platform and the weight of the cable for towed sonar depth. The current form factor of the CUSV is limiting the maximum performance that can be extracted from the AN/AQS-20C sonar suite.[2]
 
Another limiting factor, according to Captain Hattaway, is the range offered by the CUSV. Line of sight between the LCS mothership and the CUSV is required. In heavy sea states, effectiveness is limited. Bandwidth is taxed by the amount of information that needs to be shared back and forth to the operator and the sensor suites. The U.S. Navy is working on methods to extend the range of deployed CUSVs, including the use of Starshield, the U.S. military’s arm of the Starlink satellite internet platform.[2]

Conclusion
 
Really?  Isn’t the conclusion pretty obvious?
 
 
 
____________________________________
 
[1]Naval News website, “Unproven Littoral Combat Ships are replacing retired MCM ships in Bahrain”, Carter Johnson, 26-Sep-2025,
https://www.navalnews.com/naval-news/2025/09/combat-ineffective-littoral-combat-ships-are-replacing-mcm-ships-in-bahrain/
 
[2]Naval News website, “Update on the U.S. Navy’s Littoral Combat Ship Mine Countermeasures Mission Package”, Carter Johnson, 4-Jan-2025,
https://www.navalnews.com/naval-news/2025/01/update-on-the-u-s-navys-littoral-combat-ship-mine-countermeasures-mission-package/

4 comments:

  1. I don't want to rehash the previous discussion, but I would have thought that if you convey your top military brass, you should have gone further than grooming and standards and ROE ... etc. to address these sort of issues which are not limited to the navy (many failed iterations on armour & fires since RMA , F35 maintenance costs and specs shortcomings ... ). And rather than threatening to fire "liberal" officers, announce that you are firing officers responsible for this mess !

    ReplyDelete
    Replies
    1. Without a doubt, there are many officers who should be fired for sheer incompetence. The failure to do so is one of my concerns and criticisms of Hegseth, so far.

      Delete
  2. Looking forward to the PLANS new class of submarine mine layers and even an unmanned drone sub mine layer, a dozen mines against the USN with near zero MCM capability is a worthwhile project. The Navy lacks representation from the MCM community, as the kids say.

    ReplyDelete
    Replies
    1. "a dozen mines against the USN"

      I'll paraphrase something a friend once said ... A dozen or so mines in a dozen of our major mainland ports and watch the Navy go into convulsions trying to rush back home and clear mines and protect the ports. That alone would nearly incapacitate the entire Navy. We would be surging our forces backward instead of forward ... and without the proper equipment to do the job!

      Delete

Comments will be moderated for posts older than 7 days in order to reduce spam.