After ignoring the law for the last few years and not
providing Congress with an annual, 30 year shipbuilding plan as mandated in Section
231 of Title 10, United States Code, the Navy has finally delivered a plan to Congress. The Navy’s blatant and illegal disregard for
the law is both appalling and criminal although, disappointingly, no criminal
penalties are specified in the legislation.
But, I digress …
Let’s take a look at the plan.
The first thing that jumps out is that the Navy couldn’t
even come up with a plan. Instead,
they’ve submitted a group of three alternative shipbuilding paths. Two are predicated on constant shipbuilding
budgets in terms of real growth and one is predicated on substantial real growth. Apparently, despite taking multiple years to
produce this plan, the Navy couldn’t even settle on a single plan. So, instead of a plan we have nebulous
optional paths. That’s pathetic that our
professional warriors couldn’t even map out a shipbuilding plan. Instead, they’ve opted for options,
presumably, so as to avoid having to commit to an actual plan. There’s no responsibility if there’s no
actual plan, is there? Way to avoid
responsibility, Navy.
All three plans share a common first five years (2023-27,
the so called Five Year Defense Plan or FYDP period). Since the out years (beyond the five year
FYDP period) are just pure fiction, let’s take a look at the five year FYDP
period.
FYDP
New Construction
Per Table A1-2 in the plan, the FYDP period calls for the
construction of 50 new ships (32 combat vessels plus 3 SSBN plus 15 logistics
and support vessels). That’s an average
of 10 new vessels per year. The new
construction type breakdown is:
Decommissionings by year:
2023 24
2024 13
2025 13
2026 14
2027 13
Total 77
That's an average of over 15 per year versus the construction rate of 10 per year.
Of the decommissionings, 31 of the 77 will be early
retirements.
The retirements include, among others, 2 carriers (Nimitz,
Eisenhower), 17 Ticonderoga class Aegis cruisers, 11 LCS (9 Freedom and 2
Independence), the entire remaining Avenger class MCM vessels, 10 of the
remaining 11 Whidbey Island and Harper’s Ferry class LSDs which carry the bulk
of our LCAC landing craft and well deck capacity, 3 of the 4 SSGNs which are
the most potent offensive assets in the Navy, 7 Henry J. Kaiser class T-AO
oilers, and assorted other logistic and support ships.
So, over the next five years we’re decommissioning 77 ships
and building 50 new ones for a net decrease of 27 ships. Anyone see a problem, here?
Unmanned
Here’s the Navy vision for unmanned vessels:
…
unmanned platforms will achieve 89-149 platforms in FY2045 … [1, p.8]
As you can see, with no proof of concept, the Navy has
already committed to a significant portion of the fleet being small, unmanned
vessels.
Sealift Capacity
The report cites a current requirement for 85 sealift ships
versus a current inventory of 71 ships for a net deficit of 14 ships. The Navy plans to address the deficit by
acquiring 22 used ships for conversion to sealift at a total cost of $1.011B
(average $46M per ship).
Summary
The plan random paths offered by the Navy paint a
clear picture of a Navy that is floundering, unable to even offer a coherent,
single plan. We are retiring, and will
continue to retire, ships at twice the rate we’re building new ones. Worse, the ships we’re shedding are large and
powerful and are being numerically replaced by small, nearly defenseless,
unmanned vessels. As we’ve demonstrated
in previous posts, the Navy VLS inventory is going to shrink drastically along
with a shortfall of submarines.
This so-called 30 year plan is both a joke and a horrifying nightmare
demonstration of incompetence on a scale that leads to the inexorable conclusion
that our nation’s maritime security is in great danger.
_________________________________
[1]Office of the Chief of Naval Operations, “Report to
Congress on the Annual Long-Range Plan for Construction of Naval Vessels for
Fiscal Year 2023”, Apr-2022